POST 2026 Document updates

Several POST checklists have recently been updated to include minor clarifications and administrative adjustments. These updates do not change the overall intent of the documents but are intended to improve clarity, consistency, and alignment with regulatory expectations.

Members are encouraged to visit the Documents section of the POST website to download the most current versions and ensure they are using the latest checklists in the field.

Summary of Updates

Deep Excavation Checklist

Updated table for overhead line clearances, clarified that the specified overhead line clearances refer to the radius (e.g., equipment operating radius)

Working at Heights Checklist

Added the requirement of a spotter / ground person while operating elevated work platforms.

Confined Space Checklist

  • Moved Item #11 to Item #3 to prioritize the requirement of a confined space entry permit.
  • Added Quebec atmospheric testing levels to log

Equipment lifting Checklist

Updated table for overhead line clearances, clarified that the specified overhead line clearances refer to the radius (e.g., equipment operating radius)