POST Documents

Posted on by

Download our Documentation Here:

Welcome to the PostTraining Document Download Page. Below, you can find support and training documents related to your PostTraining Certification.

Notice: POST documentation is intended for personal use by the POST member community and is not intended to be used by third-party resellers without the express written permission of the OPCA. For more information, read our Legal Notice here.

There are files in both English and Francais.

POST Documents Updates 2025

Maintenance Safe Work Permit
  • Updated for better flow and clarity
  • Added EV considerations:
  • EV Charging / Energy Storage Systems under site hazards
  • Arc Flash PPE when required
DSWP & JSA
  • Added EV considerations:
    • EV Charging / Energy Storage Systems under site hazards
    • Arc Flash PPE when required

Equipment Lifting – Beta

  • Updated Chart: Minimum Clearance to High Voltage Lines

The Equipment Lifting Checklist is currently in beta testing. Companies may continue using the existing Heavy Equipment Lifting and Critical Lifting checklists, but we encourage them to try the new checklist and share their feedback with POST.

Update: This checklist will become permanent in early 2025, replacing both the Heavy Equipment Lifting and Critical Lifting checklists.

Heavy Equipment Lifting & Critical Lifting Checklists
  • Updated chart for minimum clearance to high voltage lines (see note above)

Important! Please refer to the POST document Numbering System Master below to ensure you use the most current POST document.

Guidelines

Permits, Forms, Observation and Evaluation

Critical Checklists

Save