Construction fencing should be secure An L3 contractor was installing a tank at a station in central Norway. The tank was stored outside of the securely fenced working area, with Continue Reading →
A Technician was using an acetylene torch to defrost a frozen evaporator drain pan inside a walk-in cooler. The MC size cylinder was standing on a shelf next to the Continue Reading →
Proper excavation procedures not applied Contractor was placing a tank in a deep excavation. While doing this, workers of the L3 were standing underneath the suspended load. The slopes of Continue Reading →
POST Safe Work Permits and Checklists must be completed A technician was responding to a routine maintenance call to repair a compressor located on the facility roof. The security panel Continue Reading →
An L4 Contractors employee was cutting 20mm diameter Flexible Conduit casing over wiring – used in the Red-Bar installation. The task involved running the knife in a circular motion around Continue Reading →
Confined Space Entry and Working at Heights procedures must be followed A service technician was attempting to repair a neon transformer that was located in the alucobond of a canopy. Continue Reading →
Be aware of your work surrounding and identify hazards Laceration to Knuckle! An HVAC technician arrived onsite and discovered that the rooftop AC unit was frozen. After the HVAC unit Continue Reading →
A framer was using an air nail gun during a roof truss installation. He moved to nail the next truss when the air hose got snagged, pulling back on the Continue Reading →